On 6 November 2026, Stadium 974 in Doha hosted Hans Zimmer Live: The Next Level, a new live production of the composer's film music with his 19-piece band. The concert was organised by Visit Qatar, with Proactiv Entertainment as main contractor.
Behind the stage, Techman Solutions delivered the temporary CCTV and security network for the venue, designed and commissioned in cooperation with MOI-SSD.
From the first camera to a full control room
Within a four-day installation window, our team built the complete surveillance system for the stadium precinct:
- PTZ speed domes and bullet cameras on the stand railings, poles and stage trusses
- A temporary IP network and fiber links connecting every camera point
- Recording on NVR systems, with live monitoring from a fully equipped control room
The system ran throughout the concert and was dismantled after the event.
Built for one night, working like a permanent system
Events like this leave no room for a second attempt. The cameras, the network and the control room had to work from the first minute, alongside the security operation for thousands of visitors.
"A concert is one night, but the security system behind it has to be ready like a permanent one. Working with MOI-SSD, our team delivered it in four days," said Seid Halilčević, Managing Partner & CTO, Techman Solutions.
The Hans Zimmer concert joins a growing list of events supported by Techman Solutions, including the World Investment Forum 2026 and the FIFA Fan Festival in Doha. Read the project story.



